G. Ravindran, J.F. Chung, J.T.Y. Chin, and Y. Ali. 2025. “Design of Temporary Construction Adit and Tunnel Plug for Nenggiri Hydroelectric Project”. AIJR Proceedings 7 (7): 191-202. https://doi.org/10.21467/proceedings.7.7.17.