G. Ravindran, J.F. Chung, J.T.Y. Chin, & Y. Ali. (2025). Design of Temporary Construction Adit and Tunnel Plug for Nenggiri Hydroelectric Project. AIJR Proceedings, 7(7), 191-202. https://doi.org/10.21467/proceedings.7.7.17