[1]
Francis Lee et al. 2025. Enhancing Tunnel and Cavern Designs through Seismic Tomography and Numerical Ground Information Modelling (GIM) of Rock Mass Quality Data. AIJR Proceedings. 7, 7 (Nov. 2025), 36–48. DOI:https://doi.org/10.21467/proceedings.7.7.4.