Proposed Methodology for Evaluating the Allowable Peak Particle Velocity Limit of Stabilized Rock Slopes with Rock Dowels Subject to Blasting Vibration

Authors

  • Ivan H.H. Chan Geotechnical Engineering Office, Civil Engineering and Development Department, The Government of the HKSAR, Hong Kong SAR, China Author
  • Stanley Y. T. Cheung Geotechnical Engineering Office, Civil Engineering and Development Department, The Government of the HKSAR, Hong Kong SAR, China Author
  • Daniel Y. P. Ho Geotechnical Engineering Office, Civil Engineering and Development Department, The Government of the HKSAR, Hong Kong SAR, China Author
  • Guy Bridges AECOM Asia Company Limited Author
  • Genie C. Y. Nip AECOM Asia Company Limited Author
  • Matthew W. H. Fong AECOM Asia Company Limited Author

DOI:

https://doi.org/10.21467/proceedings.8.2.5

Abstract

Blasting-induced vibrations pose a safety concern regarding the stability of rock slopes, particularly in urban infrastructure projects where stringent peak particle velocity (PPV) limits are commonly enforced. These vibration limits, typically determined from empirical guidelines, may not reflect the actual resistance capacity of stabilized rock slopes with rock dowels. Such limitations on blasting operations, imposed through restrictions on the Maximum Instantaneous Charge (MIC) weight, can lead to increased construction time and costs. This paper presents a methodology supported by field data from a pilot project that enable the application of a higher PPV limit for stabilized rock slopes with rock dowels subject to blasting vibrations. Moreover, the site monitoring results demonstrated that stabilized rock slope could withstand blasting vibrations exceeding 25 mm/s. This work bridges the current divide between prescribed guidelines and actual field performance, enabling more cost-effective and efficient blasting operations while maintaining safety.

References

Nicoll, K.H., Cowland, J.W. & Chan, R.K.S. 1992. Effects of blasting on the stability of adjacent rock slopes. Proceedings of Conference “Asia Pacific – Quarrying the Rim”. Hong Kong. Institute of Quarrying.

Chopra, A.K. 2020. Dynamics of Structures: Theory and Applications to Earthquake Engineering (5th edition in SI units). Pearson Education Limited.

Geotechnical Engineering Office 2010. GEO Technical Guidance Note No. 28: New Control Framework for Soil Slopes Subjected to Blasting Vibrations. Geotechnical Engineering Office, Hong Kong SAR.

Geotechnical Engineering Office 2018. Geoguide 4: Guide to Cavern Engineering (2nd edition). Geotechnical Engineering Office, Hong Kong SAR.

Geotechnical Engineering Office 2020. GEO Technical Guidance Note No. 10: Enhancement of Rock Slope Engineering Practice Based on Findings of Landslide Studies. Geotechnical Engineering Office, Hong Kong SAR.

Li, U.K. & Ng, S.Y. 1992. Prediction of blast vibration and current practice of measurement in Hong Kong. Proceedings of Conference “Asia Pacific – Quarrying the Rim”. Hong Kong. Institute of Quarrying.

Wong, H.N. & Pang, P.L.R. 1992 (Reprinted 2000). GEO Report No. 15: Assessment of Stability of Slopes Subjected to Blasting Vibration (GEO Report No. 15). Geotechnical Engineering Office, Hong Kong SAR.

Downloads

Published

2026-09-17

How to Cite

[1]
Ivan H.H. Chan, Stanley Y. T. Cheung, Daniel Y. P. Ho, Guy Bridges, Genie C. Y. Nip, and Matthew W. H. Fong, “Proposed Methodology for Evaluating the Allowable Peak Particle Velocity Limit of Stabilized Rock Slopes with Rock Dowels Subject to Blasting Vibration”, AIJR Proc., vol. 8, no. 2, pp. 58–66, Sep. 2026, doi: 10.21467/proceedings.8.2.5.